The Initial Plan for Factory Construction
  • Type of product, product capacity, design specification
  • Calculation of the cleanroom area
  • Consideration on airflow, cleanliness, and cleanroom category
  • The arrangement for process equipment
  • Classification data collection for process equipment's facility requirement(Include water, electricity, gas)
  • Moving lines of the process, relocation, shipping, personnel access arrangements
  • The location arrangement, safety and convenience consideration for factory system
  • Factories funding and milestone planning
  • The investigation on the environment special requirement of the product 
  • Reserved for future development and expansion
  • Environmental Protection Impact Assessment Plan

Investigation Plan
  • Type of product, product quantity, Scope of work, Production process, Future plan
  • Land selection, The external environment, Geological drilling (soil, water level), Vibration measurement
  • Legislation

Basic Plan
  • Construction area
  • Process layout
  • Environmental requirement
  • Main facilities requirement
  • Line planning
  • Energy saving review
  • Project organization chart

Basic Design
  • Consideration on factories design
  • Finalize on process equipment processes
  • Cleanroom requirement conclusive
  • Finalized demand on factories facilities
  • Automated way confirmation
  • Staff organization chart arrangement
  • Completion of basic design drawing
  • The method to build the building body structure
  • Countermeasures and expand for pollution prevention
  • Finalized on build material & expand the electrostatic countermeasures

Detail Design
  • Completion of the detail design drawing
  • Completion of the contract documents
  • Project detail review
  • Machine relocation planning
  • Estimation of cost budget

Construction Supervision
  • Confirmation on construction drawing
  • Project process management
  • Project quality management
  • Construction environment management
  • Sub-contractor management

Project Check and Acceptance
  • Quality audits
  • System commissioning, data recording
  • System functional test
  • As-build drawing and other related information collect and binding
  • System manual and manual collect and binding
  • Collect and binding test & inspection report
  • Make punch list
  • Punch list improvement
  • Performance acceptance procedures
  • Operation training

Hook-Up
  • The procedure for machine relocation and setting schedule
  • Person-in-charge organization chart for equipment machinery operation
  • Equipment machinery support work preparation: procurement, customs, administrative, logistic, and lighting…
  • Hook-Up vendor evaluation selection and contract award
  • Equipment relocation execution
  • Various Hook-up project
  • Hook-up project testing and acceptance
  • Trial production start

Process machine testing, trial production
  • Partial factories system supply
  • Security and surveillance system fully enter to the state of alert
  • The process equipment start-up functional test
  • Process start to operate

 
The last article: Consideration    The next article: Factor of cost
 
Address:Room B505,Weiting science and technology innovation building,No 8 Weizheng Road, Weiting Town, Suzhou Industrial Park   |   Telephone:+86-512-62745199   |  Fax:+86-512-62743199  |  Sitemap
COPYRIGHT (C) 2012 Jiangsu IAQ Engineering Co.,Ltd. ALL RIGHTS RESERVED.   Technical support:Meng-e.com