Environment Conditions
• The relocation of staffs, materials and manufacture machines is appropriate
• Clearly Classified different cleanliness class for different area such as production area, maintenance area and
corridor
• The temperature and humidity have control by 24 hours automotive monitoring system and usage patterns
• The smoothly of pipeline, moving lines in facility supply system
• Cleanroom level design assessment
• The convenience of secondary piping hock-up construction
• The convenience of overall system maintenance
Economic Conditions
• The reasonable of factory system supply and equipment procurement.
• The life cycle of the facility supply system and the equipment operation
• The initial set-up cost
• Operation cost
Reliability & Stability
• The stability of factory supply system
• The stability of the operation of process equipment
• The reliability of all raw materials
• The high productivity feasibility assessment
• The back-up equipment evaluation & selection
• Storage system design
Safety and environment protection requirements
• Safety Consideration on cleanroom operators, the evacuation route direction is clearly indicated
• Classification and prevention of noise, vibration, acid, exhaust, drainage etc
• Marked and suspension position layout
• The fire system such as smoke and spray smoke etc
• The design and installation for emergency lighting, shower and eyewash system
• Established the poison gas, waste gas and waste water system
• Established the emergency contact networks
• The establish and implementation of emergency response procedures
• The establish of environmental protection facilities such as poison gas and waste water treatment
• Process waste reduction
• Recycling, renewable, remanufacture →reuse
Flexible expansion capabilities
• Space reserved
• The allowance capacity of factory supply
• The convenience of the compartment removable
• Production line layout
• The design and planning for non-stop expansion
• The interaction between production fab and support area
• The design of the supply line expansion margin considerations
• Expansion construction isolation
Operating Condition
• Availability of back-up system
• Establish emergency stop for
• Door interval lock between cleanroom area and contaminated area
• Arrangement for shock proof and sound insulation works
• The protection for instant power restoration
• Establish energy saving countermeasures
• Easy to maintenance
• Establish reliability monitoring system
Personal comfort consideration
• The main assets of the company
• Humane management
• The staffs moving line in and out
• The facilities required on daily life